I. Determination and Accountability of ICBM and SLBM Throw-weight
1. The throw-weight demonstrated in a flight test of an ICBM or SLBM shall be:
(a) for an ICBM or SLBM the final stage of which executes a procedure for dispensing reentry vehicles,
the aggregate weight of that stage including its propellant and elements not separated from the stage, at
the time at which the first release of a reentry vehicle or penetration aid occurs, and its payload;
(b) for an ICBM or SLBM that is not an ICBM or SLBM the final stage of which executes a procedure
for dispensing reentry vehicles, the weight of the payload of the final stage or final stages.
2. For each ICBM or SLBM of an existing type, the accountable throw-weight shall be the greatest
throw-weight demonstrated in flight tests of an ICBM or SLBM of that type.
3. For each ICBM or SLBM of a new type, the accountable throw-weight shall be the greatest
throw-weight demonstrated in flight tests of an ICBM or SLBM of that type, which shall be determined
subject to the following provisions:
(a) The greatest throw-weight demonstrated in flight tests of an ICBM or SLBM of a new type shall be
no less than the maximum calculated throw-weight that an ICBM or SLBM of that type could deliver to
a distance of 11,000 kilometers for ICBMs, or to a distance of 9500 kilometers for SLBMs.
(b) None of the first seven flight tests shall be taken into account in determining the greatest
throw-weight demonstrated in flight tests of an ICBM or SLBM of a new type unless the throw-weight
demonstrated in such a flight test exceeds the greatest throw-weight demonstrated in subsequent flight
tests by more than 20 percent or 250 kilograms, whichever is less, prior to an ICBM or SLBM of that
type becoming subject to the limitations provided for in Article II of the Treaty.
4. The maximum calculated throw-weight that an ICBM or SLBM of a new type could deliver to a
particular distance shall be calculated by the Party developing such a missile using its own methods of
calculation, subject to the following conditions:
(a) the distance to which the throw-weight is delivered shall be measured along the projection of the
missile's flight trajectory on the Earth's surface between the launch point and the point that a reentry
vehicle that is released immediately after termination of the main engine thrust of the final stage is
projected to impact the Earth;
(b) a spherical, non-rotating Earth;
(c) a vacuum ballistic trajectory for the reentry vehicle;
(d) a full propellant load for each stage; and
(e) the residual propellant in each stage shall not be greater than one percent for solid-propellant ICBMs
or SLBMs, or two percent for liquid-propellant ICBMs or SLBMs.
5. Each Party undertakes not to increase the accountable throw-weight of an ICBM or SLBM of an
existing type, as determined in accordance with paragraph 2 of this Section, by more than 21 percent of
its initial accountable throw-weight.
6. Notifications concerning data on throw-weight of ICBMs or SLBMs in connection with this Protocol
shall be provided in accordance with Section III of the Notification Protocol. Throw-weight values,
measured in kilograms, shall be specified to the nearest value evenly divisible by 50.
7. In the event of a dispute concerning the initial value of accountable throw-weight of an ICBM or
SLBM of a new type, or an increased value of accountable throw-weight of an ICBM or SLBM of an
existing or new type, specified in a notification provided in accordance with Section III of the
Notification Protocol, the accountable throw-weight shall be the value specified in such notification until
such dispute is resolved in the Joint Compliance and Inspection Commission.
II. Verification
1. Verification of compliance with provisions of this Protocol shall be by national technical means of
verification.
2. To facilitate verification, for an ICBM and SLBM of each new type, two preannounced flight tests
shall be conducted either in the 12-month period prior to an ICBM or SLBM of that type becoming
subject to the limitations provided for in Article II of the Treaty, or from among the last five flight tests
prior to an ICBM or SLBM of that type becoming subject to the limitations provided for in Article II of
the Treaty.
3. No more than one pre-announced flight test of an ICBM or SLBM shall be conducted pursuant to
paragraph 2 of this Section in any 30-day period.
This Protocol is an integral part of the Treaty and shall enter into force on the date of entry into force of
the Treaty and shall remain in force so long as the Treaty remains in force. As provided for in
subparagraph (b) of Article XV of the Treaty, the Parties may agree upon such additional measures as
may be necessary to improve the viability and effectiveness of the Treaty. The Parties agree that, if it
becomes necessary to make changes in this Protocol that do not affect substantive rights or obligations
under the Treaty, they shall use the Joint Compliance and Inspection Commission to reach agreement on
such changes, without resorting to the procedure for making amendments set forth in Article XVIII of
the Treaty.
Done at Moscow on July 31, 1991, in two copies, each in the English and Russian languages, both texts
being equally authentic.
FOR THE UNITED STATES OF AMERICA:
George Bush
President of the United States of America
FOR THE UNION OF SOVIET SOCIALIST REPUBLICS:
M. Gorbachev
President of the Union of Soviet Socialist Republics