*Note: Titles in this table have been shortened slightly. Only the titles as they appear in the actual Treaty text are official.
Pursuant to and in implementation of the Treaty Between the United States of America and the Union of Soviet Socialist Republics on the Reduction and Limitation of Strategic Offensive Arms, hereinafter referred to as the Treaty, the Parties hereby agree upon provisions that establish the procedures for, and the content of, the notifications provided for in Article VIII of the Treaty.
I. Notifications Concerning Data With Respect to Items Subject to the Limitations Provided for in
the Treaty, According to Categories of Data Contained in the Memorandum of Understanding and
Other Agreed Categories of Data
Each Party shall provide to the other Party, pursuant to subparagraph 3(a) of Article VIII of the Treaty,
the following notifications concerning data with respect to items subject to the limitations provided for in
the Treaty, according to categories of data contained in the Memorandum of Understanding and other
agreed categories of data:
(1) notification, no later than 30 days after entry into force of the Treaty, providing data current as of
the date of entry into force of the Treaty for each category of data contained in the Memorandum of
Understanding;
(2) notification, no later than 30 days after the expiration of each six-month period following the entry
into force of the Treaty, providing updated data for each category of data contained in the Memorandum
of Understanding. The first of these six-month periods shall begin the first day of the calendar month
following the month in which the Treaty enters into force. Such notification shall include, for each
Party, all its data for each category of data contained in the Memorandum of Understanding;
(3) notification, no later than five days after it occurs, of each change in data with respect to items
subject to the limitations provided for in the Treaty, according to categories of data contained in the
Memorandum of Understanding or other agreed categories of data, unless notification of such change has
been provided in accordance with another paragraph of this Protocol. Such notification shall include:
the change in data, by number and, as applicable, type, category, variant, and version of the items; the
location of the items; the date on which such a change occurred; and, for ICBMs for mobile launchers of
ICBMs, the data from the unique identifier. Such notification shall also include the geographic
coordinates of the location of the following that relate to the change: except for silo launcher groups,
each facility, including any eliminated facility, any facility subject to continuous monitoring, and any
monitored facility; each silo launcher of ICBMs; each silo used as a launch control center; each other
launch control center; each deployment area; each rail garrison entrance/exit; each fixed test launcher;
and each heavy bomber or former heavy bomber converted for use as a ground trainer. Such notification
shall further include:
(b) for disablement beyond repair of an item accountable under the provisions of the Treaty: the
circumstances of the disablement;
(c) for elimination of a silo launcher of ICBMs, silo training launcher, silo test launcher, or soft-site
launcher, at which grading is not to be performed, a statement that the date specified is the date of
completion of the elimination process for such a launcher;
(d) for new facilities, for new kinds of support equipment, and, as applicable, for new types, categories,
variants, and versions of items: a statement that site diagrams for new facilities, and photographs of new
kinds of support equipment, and, as applicable, for new types, categories, variants, and versions of items
that meet the requirements for site diagrams and photographs set forth in Annex J to the Memorandum of
Understanding will be provided through diplomatic channels no later than 48 hours after the notification
provided for in this paragraph;
(e) for new variants of ICBMs and SLBMs and new versions of mobile launchers of ICBMs, the
location for the exhibition or exhibitions conducted pursuant to paragraph 11 of Article XI of the Treaty;
and the date for such an exhibition or such exhibitions, which shall be no earlier than 15 days and no
later than 30 days after this notification has been provided;
(4) notification, no less than 30 days in advance, of a reduction in the number of warheads attributed to
ICBMs at an ICBM base or to SLBMs on ballistic missile submarines at submarine bases. Such
notification shall include: the type of ICBM or the type of SLBM to which a reduced number of
warheads will be attributed; the reduced number of warheads that will be attributed to deployed ICBMs
or deployed SLBMs of that type; the planned date on which the reduced number of warheads is to be
attributed to such ICBMs or SLBMs; and the ICBM base for the ICBMs to which the reduced number of
warheads will be attributed, or the submarine bases for the ballistic missile submarines for the SLBMs to
which the reduced number of warheads will be attributed;
(5) notification, no later than February 1 of each year, of planned changes, as of the end of that calendar
year, in the number of deployed strategic offensive arms. Such notification shall include: the planned
aggregate number as of the end of that calendar year of deployed ICBMs and their associated launchers
by type, deployed SLBMs and their associated launchers by type, and deployed heavy bombers by type
and category; the planned number of ICBMs and SLBMs to be converted or eliminated by type; the
planned number of ICBM launchers to be converted or eliminated by type; the planned number of SLBM
launchers to be converted or eliminated by type; and the planned number of heavy bombers, by type and
category, to be converted into heavy bombers of another category or into former heavy bombers, and the
planned number of heavy bombers to be eliminated. If the expected number of deployed strategic
offensive arms of any type will be greater as of the end of that year than the planned number that was
specified in accordance with this paragraph, notification of such expected number of deployed strategic
offensive arms as of the end of that year shall be provided no less than 30 days in advance of such a
change;
(6) notification containing a request regarding locations within one minute of latitude and longitude of
each other, the coordinates of which are provided to the nearest minute, that are considered by the Party
receiving data on such locations to have the same appearance. Such notification shall include: the name
or designator of the locations; their geographic coordinates; and reasons that the Party considers such
locations to have the same appearance;
(7) notification, no later than 15 days after receipt of a request pursuant to paragraph 6 of this Section,
regarding locations within one minute of latitude and longitude of each other. Such notification shall
include: the name or designator of the requested locations; information permitting the
other Party to differentiate between the specified locations, or the geographic coordinates of the locations
to include seconds of sufficient accuracy to differentiate between the locations;
(8) notification, no later than 48 hours after it has been completed, of the transfer of items to or from a
third State in accordance with a pattern of cooperation existing at the time of signature of the Treaty
referred to in Article XVI of the Treaty and the First Agreed Statement in the Annex to the Treaty on
Agreed Statements. Such notification shall include: the number and type of items transferred; the date of
transfer; and the location of transfer;
(9) notification, no less than 30 days in advance of the exit from a newly constructed facility or a facility
for which such items have not been specified in the Memorandum of Understanding, or no less than 30
days in advance of the appearance of an ICBM, SLBM, first stage of an ICBM or SLBM, solid rocket
motor for the first stage of an ICBM for mobile launcher of ICBMs, mobile launchers of ICBMs, or
heavy bomber at such a facility, or no less than 30 days in advance of the date to be specified in the
notification of a new facility provided in accordance with paragraph 3 of this Section, or no less than 30
days in advance of the date to be specified in the notification of the change of category of a facility
provided in accordance with paragraph 3 of this Section, 1 JCIC Agreement No. 27, Article 1. of the existence of a new facility or a change of
category of a facility. Such notification shall include: the name of the facility; its function according to
the categories of data contained in the Memorandum of Understanding; and its geographic coordinates.
Such notification shall not be required if notification was provided in accordance with paragraph 10 of
this Section;
(10) notification of the location of a production facility, not previously declared, at which production of
ICBMs or SLBMs or first stages of ICBMs or SLBMs is planned, no less than 90 days in advance of the
exit from such a facility of the first of the items specified in the notification. Such notification shall
include: the name of the production facility; the type of items that will be produced at the facility; the
planned date of the exit from the facility of the first of the items that will be produced at the facility; the
geographic coordinates of the facility; and, if the production facility is a production facility for ICBMs
for mobile launchers of ICBMs or first stages of such ICBMs or if the ICBMs or SLBMs or first stages
of the ICBMs or SLBMs that will be produced at the facility are as large as or larger than the smallest
ICBM for mobile launchers of ICBMs, a statement that the site diagram of the facility, which meets the
requirements for site diagrams specified in Annex J to the Memorandum of Understanding, will be
provided through diplomatic channels no later than 48 hours after the notification provided for in this
paragraph;
(11) notification, no later than five days after excavation begins, of the beginning of construction of a
new silo launcher of ICBMs. Such notification shall include: the type of ICBM which the silo launcher
under construction will contain; the name of the ICBM base; the geographic coordinates of the silo
launcher of ICBMs under construction; and the date on which excavation began;
(12) notification, no later than five days after production has ceased, of the cessation of production of
ICBMs for mobile launchers of ICBMs or first stages of such ICBMs at a monitored facility. Such
notification shall include: the monitored facility and the date on which such production ceased;
(13) notification, no later than 30 days after entry into force of the Treaty, providing the data from the
unique identifier for each ICBM for mobile launchers of ICBMs existing as of the date of entry into force
of the Treaty. Such notification shall include: the data from the unique identifier; the
restricted area, rail garrison, or other facility at which the ICBM for mobile launchers of ICBMs is
located, or, if the ICBM for mobile launchers of ICBMs is in transit or relocation, its destination;
(14) notification declaring that ICBMs or SLBMs of a type shall be considered to be ICBMs or SLBMs
of a retired type. Such notification shall include: the type, number, and location for each such ICBM or
SLBM;
(15) notification, beginning three months after the notification that ICBMs of a type for mobile
launchers of ICBMs shall be considered to be ICBMs of a retired type in accordance with paragraph 14
of this Section, and at each three-month period thereafter, of the number and location, by facility, of the
retired ICBMs of that type. Such notifications shall continue for as long as the Party has such retired
types. In the event that a Party has more than one type of such ICBMs of a retired type, it shall provide
notification for all such retired ICBMs no later than the last day of each three-month period that follows
the notification of the first retired type of such ICBM;
(16) notification, beginning six months after the notification provided in accordance with paragraph 14
of this Section and at each six-month period thereafter, of the type, number, and location of ICBMs and
SLBMs of retired types, other than ICBMs of retired types of ICBMs for mobile launchers of ICBMs.
Such notifications shall continue for as long as the Party has ICBMs or SLBMs of such retired types. In
the event that a Party has more than one type of such ICBMs or SLBMs of a retired type, it shall provide
notification for all such retired ICBMs and SLBMs no later than the last day of each six-month period
that follows the notification of the first retired type of ICBM or SLBM;
(17) notification, no later than 90 days after entry into force of the Treaty, providing data current as of
the date of entry into force of the Treaty for ICBMs and SLBMs of former types. Such notification shall
include: the type, number, and location for each such ICBM and SLBM;
(18) notification, no later than 30 days after the expiration of each six-month period following entry into
force of the Treaty, providing updated data for ICBMs and SLBMs of former types. The first of these
six-month periods shall begin the first day of the calendar month following the month in which the
Treaty enters into force. Such notification shall include: the type, number, and location for each such
ICBM and SLBM.
(19) notification, no later than five days after the effective date of a change, of the change to the boundary
of the facility specified on the site diagram. Such notification shall include: the name and function of the
facility; the subtitle, if applicable; the geographic coordinates of the facility; the effective date of the
change; the reference to the Joint Compliance and Inspection Commission document; and a statement
that a revised site diagram for the facility and a site diagram of excluded portions of the facility will be
provided through diplomatic channels no later than 48 hours after the notification provided for in this
paragraph. 2 JCIC Agreement No. 29, Article 2.
II. Notifications Concerning Movement of Items Subject to the Limitations Provided for in the Treaty
Each Party shall provide to the other Party, pursuant to subparagraph 3(b) of Article VIII of the Treaty,
the following notifications concerning movement of items subject to the limitations provided for in the
Treaty:
(1) notification, no later than 48 hours after its completion, of the transit of non-deployed ICBMs and
non-deployed SLBMs; launch canisters that remain after flight tests of ICBMs for mobile launchers of
ICBMs; non-deployed mobile launchers of ICBMs; and mobile training launchers. Such notification
shall include: the number and type of items involved; the facility from which the items departed; the date
of departure; the facility at which the items have arrived; the date of arrival; the mode of transport; and,
for each ICBM for mobile launchers of ICBMs, the data from the unique identifier;
(2) notification, no later than eight hours after a visit of a heavy bomber or former heavy bomber has
exceeded 24 hours in duration, of the visit of such an airplane to a specified facility for heavy bombers or
former heavy bombers or to an eliminated facility. Such notification shall include, for each air base;
production facility, repair facility, conversion or elimination facility, or storage facility for heavy
bombers or former heavy bombers; heavy bomber flight test center; training facility for heavy bombers;
or eliminated facility: the number, by type, category, and, if applicable, variant, of the heavy bombers
and former heavy bombers that are visiting; the air base, heavy bomber flight test center, production
facility for heavy bombers or former heavy bombers, or training facility for heavy bombers, at which
such airplanes are based; the facility such airplanes are visiting; and the date and time of arrival;
(3) notification, no later than 24 hours after departure, of the conclusion of the visit of a heavy bomber
or former heavy bomber, notification of which has been provided in accordance with paragraph 2 of this
Section. Such notification shall include, for each visited facility: the number, by type, category, and, if
applicable, variant, of the heavy bombers and former heavy bombers that have concluded the visit; the
facility visited by such airplanes; the air base, heavy bomber flight test center, production facility for
heavy bombers or former heavy bombers, or training facility for heavy bombers, at which such airplanes
are based; and the date and time of departure;
(4) notification, no less than 24 hours in advance, of the departure of each deployed rail-mobile launcher
of ICBMs and its associated missile from a rail garrison for routine movement. Such notification shall
include, for each rail garrison: the number of deployed rail-mobile launchers of ICBMs and their
associated missiles departing from the rail garrison; the rail garrison; and the date of departure;
(5) notification, no less than 24 hours in advance, of the departure of each rail-mobile test launcher from
a test range. Such notification shall include: the number of rail-mobile test launchers and the number of
launch-associated railcars departing the test range; the test range; and the date of departure;
(6) notification, no later than 24 hours after the return of each deployed rail-mobile launcher of ICBMs
and its associated missile to the rail garrison from which it departed, of its return from routine
movement. Such notification shall include, for each rail garrison: the number of deployed rail-mobile
launchers of ICBMs and their associated missiles that have returned to the rail garrison; the rail garrison;
and the date of return;
(7) notification, no later than 24 hours after the return, of the return of each rail-mobile test launcher to
the test range from which it departed. Such notification shall include: the date of return; and the test
range;
(8) notification, no later than 24 hours after the return of a train with rail-mobile test launchers to the test
range from which it departed, of any variation from the configuration of the train that was specified in
the notification provided in accordance with paragraph 5 of this Section during the time the train was
outside the test range. Such notification shall include: the dates on which each variation took place; the
portions of the route on which each variation took place; the number of launchers and launch-associated
railcars contained in the train during each such variation; and the extraordinary circumstances, which
must exist for such a variation from the configuration of the train to take place, that required a variation
from the configuration of the train;
(9) notification, no less than 24 hours in advance, of the departure of each deployed mobile launcher of
ICBMs and its associated missile from a restricted area, rail garrison, or other facility, for a relocation.
Such notification shall include, for each ICBM base for mobile launchers of ICBMs, or for each other
facility: the number of deployed mobile launchers of ICBMs and their associated missiles; the point of
departure, or the facility of origin; the destination; and the date of departure;
(10) notification, no later than 48 hours after the arrival of each deployed mobile launcher of ICBMs and
its associated missile at its destination, of the completion of the relocation. Such notification shall
include, for each ICBM base for mobile launchers of ICBMs or other facility: the number of deployed
mobile launchers of ICBMs and their associated missiles that have relocated; the facility of origin and, if
applicable, the point of departure; the date of departure; the facility at which each such launcher and its
associated missile has arrived; the date of arrival; the data from the unique identifier for each of the
ICBMs for mobile launchers of ICBMs involved in the relocation; and for those portions of the route
taken by deployed road-mobile launchers of ICBMs and their associated missiles outside the deployment
area, the location, date and time at that location at least once every four days during the relocation;
(11) notification, no later than 18 hours after the beginning of an exercise dispersal, of the beginning of
an exercise dispersal of deployed mobile launchers of ICBMs and their associated missiles. Such
notification shall include: the ICBM bases for mobile launchers of ICBMs that are involved in such a
dispersal; and the date and time of the beginning of the dispersal;
(12) notification, no later than eight hours after the completion of an exercise dispersal, of the
completion of an exercise dispersal of deployed mobile launchers of ICBMs and their associated
missiles. Such notification shall include, for each applicable ICBM base for mobile launchers of ICBMs:
the ICBM base; the date and time of the completion of the dispersal; and, for each specific restricted area
or for each specific rail garrison of the ICBM base, the number of deployed mobile launchers of ICBMs
and their associated missiles that have not returned to the restricted area or rail garrison. Such
notification shall also include:
(b) for each deployed rail-mobile launcher of ICBMs and its associated missile that has not returned to
the rail garrison, the specific facility or the geographic coordinates of the location at which each such
mobile launcher of ICBMs and its associated missile is located; and the reason for its location there;
(13) notification, no less than three hours in advance of the date of a variation from standard
configuration of a train with deployed rail-mobile launchers of ICBMs and their associated missiles, of
such a variation, if such variation will be the result of the departure of the train or of a portion of such a
train for the maintenance facility associated with the rail garrison and if the return of that train to
standard configuration cannot take place within the 12-hour period provided for the preparation for the
implementation of a cooperative measure in accordance with paragraph 2 of Article XII of the Treaty.
Such notification shall include: the ICBM base for rail-mobile launchers of ICBMs; the date when such
variation will take place; the number of launchers and launch-associated railcars contained in the portion
of the train that will depart for the maintenance facility associated with the rail garrison; and the parking
site of the train with a variation in the standard configuration, if there is a fixed structure for rail-mobile
launchers of ICBMs at such a parking site;
(14) notification, no later than 24 hours after the completion of the routine movement or no later than 48
hours after the completion of the relocation, of any variation from the standard configuration of trains
with deployed rail-mobile launchers of ICBMs and their associated missiles during routine movements
and relocations. Such notification shall include: the dates on which each variation took place; the
portions of the route on which each variation took place; and the number of launchers and
launch-associated railcars contained in the train during each such variation;
(15) notification, no later than 24 hours after the return to standard configuration, of the return to
standard configuration of a train with deployed rail-mobile launchers of ICBMs and their associated
missiles, about which a notification has been provided in accordance with paragraph 13 of this Section.
Such notification shall include: the ICBM base for rail-mobile launchers of ICBMs; the date on which
the return to standard configuration took place; and the parking site of the train that has returned to
standard configuration, if there is a fixed structure for rail-mobile launchers of ICBMs at such a parking
site;
(16) notification, no less than 48 hours in advance of the beginning of a major strategic exercise
involving heavy bombers, conducted pursuant to paragraph 2 of Article XIII of the Treaty, of the
beginning of such an exercise. Such notification shall include: the air bases for heavy bombers and air
bases for former heavy bombers that are involved in the exercise; and the date and time of the beginning
of the exercise;
(17) notification, no later than eight hours after the completion of a major strategic exercise involving
heavy bombers, about which a notification has been provided in accordance with paragraph 16 of this
Section, of the completion of that exercise. Such notification shall include the date and time of the
completion of the exercise.
III. Notifications Concerning Data on ICBM and SLBM Throw-weight in Connection with the
Throw-weight Protocol
Each Party shall provide to the other Party, pursuant to subparagraph 3(c) of Article VIII of the Treaty,
the following notifications concerning data on ICBM and SLBM throw-weight in connection with the
Throw-weight Protocol:
(1) notification, no less than seven days in advance of the eighth flight test of an ICBM or SLBM of
each new type, of data about that ICBM or SLBM. Such notification shall include: the greatest
throw-weight demonstrated in the course of the first seven flight tests; data on the maximum calculated
throw-weight that an ICBM of a new type could deliver to distances of 8000; 9000; 10,000; 11,000; and
12,000 kilometers, or that an SLBM of a new type could deliver to distances of 6500; 7500; 8500; 9500;
and 10,500 kilometers; and data on the residual propellant for each stage and on the descending ballistic
flight path angle at an altitude of 100 kilometers that were used in determining each such value of the
maximum calculated throw-weight;
(2) notification, no less than 45 days in advance of each flight test conducted to satisfy the requirements
of paragraph 2 of Section II of the Throw-weight Protocol, of data about such a flight test. Such
notification shall include: the designation of the type of ICBM or SLBM; the planned date of the flight
test; and the launch area and the planned reentry vehicle impact area, specified in accordance with the
Agreement Between the United States of America and the Union of Soviet Socialist Republics on
Notifications of Launches of Intercontinental Ballistic Missiles and Submarine-Launched Ballistic
Missiles of May 31, 1988;
(3) notification, no later than five days after an ICBM or SLBM of a new type first becomes subject to
the limitations provided for in Article II of the Treaty, of data about that ICBM or SLBM. Such
notification shall include: the accountable throw-weight; the date on which the flight test with the
accountable throw-weight was conducted; the data on the maximum calculated throw-weight that an
ICBM or SLBM of the new type could deliver to the distances specified in paragraph 1 of this Section;
and data on the residual propellant for each stage and on the descending ballistic flight path angle at an
altitude of 100 kilometers that were used in determining each such value of the maximum calculated
throw-weight;
(4) notification, no later than five days after the flight test of an ICBM or SLBM during which a
throw-weight greater than its accountable throw-weight was demonstrated, of data about that ICBM or
SLBM. Such notification shall include: the new value of the accountable throw-weight; and the date on
which the flight test with the new value of the accountable throw-weight was conducted. For an ICBM
or SLBM of a new type, the notification shall also include data on the maximum calculated throw-weight
that an ICBM or SLBM of the new type could deliver to the distances specified in paragraph 1 of this
Section; and data on the residual propellant for each stage and on the descending ballistic flight path
angle at an altitude of 100 kilometers that were used in determining each such value of the maximum
calculated throw-weight; however, if such data has not changed with respect to the data previously
declared for that type of missile, this data need not be included, but the number of the earlier notification
containing such data shall be specified.
IV. Notifications Concerning Conversion or Elimination of Items Subject to the Limitations Provided
for in the Treaty and Elimination of Facilities Subject to the Treaty
Each Party shall provide to the other Party, pursuant to subparagraph 3(d) of Article VIII of the Treaty,
the following notifications concerning conversion or elimination of items subject to the limitations
provided for in the Treaty and elimination of facilities subject to the Treaty:
(1) notification, no less than 30 days in advance of the initiation of the respective processes of
conversion or elimination of items, including placement of items on static display, of the intention to
carry out the procedures for those processes provided for in the Conversion or Elimination Protocol and
in paragraph 7 of Article III of the Treaty. Such notification shall include: the number, and, as
applicable, type, category, variant, and version of the item to be converted or eliminated, or placed on
static display; for ICBMs for mobile launchers of ICBMs, the data from the unique identifier; the
location of such item; the location at which such processes will take place; the procedures to be carried
out; and in each case, the scheduled date of the initiation of such processes;
(2) notification, no later than five days after the initiation of a conversion or elimination process, of the
date on which that process began. Such notification shall include: the number of items, and, as
applicable, the type, category, variant, and version of each item to be converted or eliminated; for ICBMs
for mobile launchers of ICBMs, the data from the unique identifier; the location for such a process; for
each item, the date of the initiation of the process; and the procedures being carried out during the
process. Such notification shall not be required if such a process was subjected to inspection;
(3) notification, no less than five days in advance, of the intention to install an ICBM of a different type
or a training model of a missile of such different type in a silo launcher of ICBMs if, during the
conversion of such silo launcher of ICBMs, the silo door was not removed. Such notification shall
include: the type of the ICBM or type of the training model of a missile to be installed in that silo
launcher of ICBMs; the location of that silo launcher of ICBMs; and the date on which an ICBM of a
different type or a training model of a missile of such different type is to be installed in that silo launcher
of ICBMs;
(4) notification, no later than five days after completion, of the completion of:
(b) the elimination of SLBM launchers. Such notification shall include: the number of SLBM launchers
eliminated; the type of SLBM; the conversion or elimination facility at which such elimination was
carried out; the date of completion of elimination; and the elimination procedures that were carried out;
(c) the elimination of heavy bombers or former heavy bombers. Such notification shall include: by type,
category, and variant, the number of heavy bombers, or, by type, the number of former heavy bombers;
the conversion or elimination facility at which such elimination was carried out; and the date of
completion of elimination;
(d) the conversion of a heavy bomber and of its arrival at a viewing site. Such notification shall include:
type, category, and variant of the heavy bomber; the conversion or elimination facility at which such
conversion was carried out; the conversion procedures that were carried out; and the date of arrival of the
heavy bomber at a viewing site;
(e) the elimination of an ICBM or SLBM, other than an ICBM for mobile launchers of ICBMs. Such
notification shall include: the number and type of ICBMs or SLBMs eliminated; the location at which
such elimination was carried out; the method of elimination; and the date of completion of the
elimination;
(f) procedures associated with making an item a static display. Such notification shall include: the type,
and, if applicable, the category and variant of the item for static display; for ICBMs for mobile launchers
of ICBMs, the data from the unique identifier; the date of arrival and the location at which inspection of
such an item may take place; and the name and coordinates of the location at which such an item is to be
on static display;
(5) notification, no later than five days after completion, of the static testing of an ICBM for mobile
launchers of ICBMs or the first stage of an ICBM for mobile launchers of ICBMs, or if such testing
involved the removal of propellant segments by dissection, each time a propellant segment is removed
from an ICBM for mobile launchers of ICBMs or from the first stage of an ICBM for mobile launchers
of ICBMs. Such notification shall include: the ICBM type; the data from the unique identifier; the
length of the remaining portion of the stage after segment removal, if static testing was accomplished
through dissection; and the location and date of the static testing;
(6) notification, no later than 90 days after entry into force of the Treaty, and no less than 90 days prior
to the beginning of each of the six subsequent one-year periods after entry into force of the Treaty, of the
annual schedule for conversion or elimination of ICBMs, SLBMs, ICBM launchers, SLBM launchers,
heavy bombers, former heavy bombers, and fixed structures for mobile launchers of ICBMs, subject to
the provisions of the Treaty. Such notification shall include: the number and types of such items
planned for conversion or elimination during that one-year period; and the planned date of the initiation
of the conversion or elimination process of each such item;
(7) notification, no less than 30 days in advance of the initiation of the elimination process for the first
ICBM of a particular type of ICBM for mobile launchers of ICBMs, of data to be used to identify the
type of such an ICBM within its launch canister. Such notification shall include: the data to be used for
the identification of the type of ICBM, including necessary dimensions; and the proposed methods to be
used by the inspectors to identify the type of ICBM for mobile launchers of ICBMs.
V. Notifications Concerning Cooperative Measures to Enhance the Effectiveness of National
Technical Means of Verification
Each Party shall provide to the other Party, pursuant to subparagraph 3(e) of Article VIII of the Treaty,
the following notifications concerning cooperative measures to enhance the effectiveness of national
technical means of verification:
(1) notification containing a request for a display in the open of road-mobile launchers of ICBMs
located within specified restricted areas, rail-mobile launchers of ICBMs located at specified parking
sites, or all heavy bombers located within a specified air base. Such notification shall include:
(b) for rail-mobile launchers of ICBMs, the rail garrisons and the parking sites at those rail garrisons at
which the display is requested;
(c) for heavy bombers, the air base at which the display is requested.
(2) notification, no later than 12 hours after receipt of a request pursuant to subparagraph 1(c) of this
Section, concerning heavy bombers that cannot be displayed on request because they are not readily
movable due to maintenance or operations. Such notification shall include: the air base; and the
number, type, and category of heavy bombers that are not readily movable due to maintenance or
operations;
(3) notification, no later than 12 hours after receipt of a request pursuant to paragraph 1 of this Section,
of the cancellation due to circumstances brought about by force majeure of the display in the open of
mobile launchers of ICBMs located within specified restricted areas or within specified parking sites or
of heavy bombers located at a specified air base. Such notification shall include: the reasons for the
cancellation of the display; the facility; and, if possible, the approximate date when conditions will
permit a new display;
(4) notification, no later than 24 hours after the exit, of the exit of a ballistic missile submarine from a
covered facility in which conversion of its SLBM launchers was carried out. Such notification shall
include: the date of exit; the facility where such conversion was carried out; the type of the submarine;
and the type of SLBM before and after conversion;
(5) notification containing a request for a display in the open of a special purpose submarine located at a
specified port. Such notification shall include the name of the port at which the display is to be
conducted.
VI. Notifications Concerning Flight Tests of ICBMs or SLBMs and Notifications Concerning Telemetric
Information
Each Party shall provide to the other Party, pursuant to subparagraph 3(f) of Article VIII of the Treaty,
the following notifications concerning flight tests of ICBMs or SLBMs and notifications concerning
telemetric information:
(1) notification of any flight test of an ICBM or SLBM, including any flight test of a prototype ICBM or
SLBM and any flight test of an ICBM or SLBM used for delivering objects into the upper atmosphere or
space. Such notification shall be provided in accordance with the provisions of the Agreement Between
the United States of America and the Union of Soviet Socialist Republics on Notifications of Launches
of Intercontinental Ballistic Missiles and Submarine-Launched Ballistic Missiles of May 31, 1988. Such
notification shall also include: telemetry broadcast frequencies to be used expressed in megahertz to the
nearest one megahertz; modulation types; and information as to whether the flight test is to employ
encapsulation or encryption pursuant to paragraph 6 of Article X of the Treaty;
(2) notification, no less than 30 days in advance of the demonstration pursuant to subparagraph 4(b) of
Section I of the Telemetry Protocol, of the proposed date and place of the demonstration of the tapes or
appropriate equipment to play back the telemetric information recorded on those tapes;
(3) notification, following the demonstration provided for in subparagraph 4(a) or 4(b) of Section I of
the Telemetry Protocol, of the request for the opportunity to acquire playback equipment pursuant to
subparagraph 4(c) of Section I of the Telemetry Protocol;
(4) notification pursuant to paragraph 3 of Section I of the Telemetry Protocol, no later than 45 days
after receipt of tapes that contain a recording of telemetric information, of the determination by the Party
that has received the tapes of the incompleteness or insufficient quality of telemetric information
recorded on the tapes that do not allow for processing of such information. Such notification shall
include: type of ICBM or type of SLBM; date of flight test; tape number; time periods during which
incomplete or low quality recordings of telemetric information were received; and a description of the
difficulties that arose during the processing of such information;
(5) notification, no less than 30 days in advance of the first flight test after entry into force of the Treaty
of an ICBM or SLBM of one existing type on which encryption of telemetric information will be carried
out pursuant to subparagraph 2(a) of Section III of the Telemetry Protocol, of the type of ICBM or type
of SLBM,
(6) notification containing a request regarding maintenance, training, spare parts, and replacement parts.
Such notification shall include, as appropriate: the type of training requested, the number of trainee team
members, the location of the training and the proposed date the training would begin; the type of
maintenance requested, and the location of the maintenance; the manufacturer's name, model number,
and part number, if applicable, of the malfunctioning equipment or its component, and a description of the
specific equipment operating problems being experienced, including the results of any diagnostic or
corrective maintenance procedures that have been attempted; the manufacturer's name, model number,
and part number, if applicable, of the spare parts or replacement parts requested;
(7) notification, no later than 20 days after receipt of a request pursuant to paragraph 6 of this Section.
Such notification shall include, as appropriate: the proposed point of entry, the proposed date of arrival of
the maintenance team or trainee team at the point of entry, the date the training will begin, the length of
the training session, the maintenance team size, the estimated delivery date of the requested spare parts
or replacement parts; and the estimated cost of the services to be provided;
(8) notification, no later than 10 days after receipt of a response provided pursuant to paragraph 7 of this
Section. Such notification shall include, as appropriate:
(b) a proposal for an alternate point of entry and an alternate date of arrival of the team or the delivery of
requested spare parts or replacement parts at the point of entry; or
(c) cancellation of a request regarding maintenance, training, spare parts, and replacement parts as
contained in the notification provided in accordance with paragraph 6 of this section. 3 JCIC Agreement No. 18, Article 3, Paragraph 1.
VII. Notifications Concerning Strategic Offensive Arms of New Types and New Kinds
Each Party shall provide to the other Party, pursuant to subparagraph 3(g) of Article VIII of the Treaty,
the following notifications concerning strategic offensive arms of new types and new kinds:
(1) notification, no less than 48 hours in advance, of the planned departure from a production facility of
the first prototype ICBM or prototype SLBM. Such notification shall include: the type of prototype
ICBM or the type of prototype SLBM; the length and diameter of the prototype ICBM or prototype
SLBM; the length and diameter of the first stage of such a prototype ICBM or prototype SLBM; the
launch weight and maximum calculated throw-weight that the prototype ICBM could deliver to a
distance of 11,000 kilometers or that the prototype SLBM could deliver to a distance of 9500 kilometers;
and the name and location of the production facility that will produce the prototype ICBM or the
prototype SLBM;
(2) notification, no later than five days after the first flight test of a prototype ICBM of a particular type
from a mobile launcher of ICBMs, or after the eighth flight test of a prototype ICBM of the same type
from a fixed launcher of ICBMs, or after the exit of the twentieth prototype ICBM of the same type from
a production facility, whichever is earlier, of whether ICBMs of that type shall be considered ICBMs for
mobile launchers of ICBMs. Such notification shall include: the type of the prototype ICBM; the name
and location of the production facility; the basing mode of the new type of ICBM; and, if the prototype is
declared to be an ICBM for mobile launchers of ICBMs, data on the technical characteristics of the
prototype ICBM according to the categories of data specified in Annex F to the Memorandum of
Understanding;
(3) notification of a decision to forego deployment of an ICBM of a new type as an ICBM for mobile
launchers of ICBMs, for a new type of ICBM that had been considered to be an ICBM for mobile
launchers of ICBMs pursuant to a notification provided in accordance with paragraph 2 of this Section
but that had not been flight-tested from a mobile launcher of ICBMs, and that such an ICBM is not
subject to the provisions for ICBMs for mobile launchers of ICBMs of the Treaty. Such notification
shall include: the type of the ICBM; and the name and location of the production facility;
(4) notification, no later than five days after the twentieth flight test of a prototype ICBM or prototype
SLBM of a particular type or the declaration by the developing Party that the ICBM or SLBM of such
particular type shall be accountable for the purposes of warhead and throw-weight attribution, or no less
than 30 days in advance of the deployment of the first ICBM or SLBM of the same particular type,
whichever is earlier, that the prototype ICBM or prototype SLBM shall be considered an ICBM or
SLBM of a new type. Such notification shall include: the type of ICBM of the new type or the type of
SLBM of the new type; the name and location of the production facility; the data for the ICBM or SLBM
of a new type by categories of data contained in the Memorandum of Understanding; if used as the basis
for the new type, a statement whether the ICBM or SLBM of the new type differs from an ICBM or
SLBM, respectively, of each existing type and previously declared new type in terms of the length of the
first stage used for confirming the new type or in terms of the launch weight; the location for the
exhibition or exhibitions conducted pursuant to paragraph 11 of Article XI of the Treaty; and the date for
such an exhibition or such exhibitions, which shall be no earlier than 15 days and no later than 30 days
after this notification has been provided;
(5) notification of the cessation of development of an ICBM or SLBM of a new type and of the intention
not to deploy such ICBMs or SLBMs. Such notification shall include: the type of the prototype ICBM or
prototype SLBM; the name and location of the production facility that produced the prototype ICBMs or
prototype SLBMs; the number of prototype ICBMs or prototype SLBMs in existence; and the
elimination facility for the prototype ICBMs for mobile launchers of ICBMs;
(6) notification, no less than 48 hours in advance of the departure, of the departure of a mobile launcher
of prototype ICBMs from its production facility. Such notification shall include: the type of the
prototype ICBM for which the mobile launcher is intended; the name and location of the production
facility; and the date of departure;
(7) notification, no later than five days after the exit, of the exit of the first heavy bomber of a new type
from the shop, plant, or building where its assembly was performed. Such notification shall include: the
type and the category of the heavy bomber; the name and location of the production facility; and the date
of exit;
(8) notification, no later than five days after the arrival, of the arrival of the first heavy bomber of a new
type, new category of a type, or new variant of a category and type at the first air base at which any such
heavy bomber has begun to be based. Such notification shall include: the type, category, and, if
applicable, variant of the heavy bomber; the air base at which the heavy bomber has begun to be based;
the date of its initial basing at that air base; the technical data for heavy bombers of the new type, new
category of a type, or new variant of a category and type provided for in Annex G to the Memorandum of
Understanding; the location for the exhibition pursuant to paragraph 12 of Article XI of the Treaty; and
the date for such an exhibition, which shall be no earlier than 15 days and no later than 30 days after such
notification has been provided;
(9) notification, at the choice of the developing Party, either no later than five days after the exit, of the
exit of the first long-range nuclear ALCM of a new type from the production facility; or no less than six
months in advance of the arrival, of the arrival of the first long-range nuclear ALCM of a new type at the
first air base for heavy bombers at which it is to be located. Such notification shall include: the type of
long-range nuclear ALCM; and either the date of exit of that first long-range nuclear ALCM of the new
type from the production facility, or the planned date of the arrival of that first long-range nuclear ALCM
of the new type at the first air base for heavy bombers, whichever is applicable;
(10) notification, no later than five days after the flight test, of the flight test of a long-range nuclear
ALCM from a bomber of a type, from none of which a long-range nuclear ALCM has previously been
flight-tested. Such notification shall include: the type of heavy bomber from which the long-range
nuclear ALCM has been first flight-tested; the date of the flight test; the heavy bomber technical data
provided for in Annex G to the Memorandum of Understanding; the location for the exhibition pursuant
to paragraph 12 of Article XI of the Treaty; and the date for such an exhibition, which shall be no earlier
than 15 days and no later than 30 days after such notification has been provided;
(11) notification, no later than 48 hours after the arrival, of the arrival of the first long-range nuclear
ALCM of a new type at the first air base for heavy bombers. Such notification shall include: the type of
long-range nuclear ALCM; the date of arrival; the technical data for a long-range nuclear ALCM of the
new type provided for in the Memorandum of Understanding; the location for the exhibition of a
long-range nuclear ALCM of the new type; and the date for such an exhibition, which shall be no earlier
than 15 days and no later than 30 days after such notification has been provided;
(12) notification, at the choice of the developing Party, either no later than five days after the exit, of the
exit of the first long-range non-nuclear ALCM of a new type from the production facility; or, if a
long-range non-nuclear ALCM of a new type has not been previously exhibited, no less than six months
in advance of the arrival, of the arrival of the first long-range non-nuclear ALCM of the new type at the
first air base for heavy bombers at which it is to be located. Such notification shall include: the type of
long-range non-nuclear ALCM; either the date of exit of that first long-range non-nuclear ALCM of the
new type from the production facility, or the planned date of the arrival of that first long-range
non-nuclear ALCM of the new type at the first air base for heavy bombers at which it is to be located,
whichever is applicable; and the features that make a long-range non-nuclear ALCM of the new type
distinguishable from long-range nuclear ALCMs. No later than 48 hours after such notification has been
provided, one photograph of such a long-range non-nuclear ALCM shall be provided through diplomatic
channels. The long-range non-nuclear ALCM shown in such photograph may be covered to the extent
provided for in paragraph 5 of Section I of Annex 4 to the Inspection Protocol;
(13) notification, if a long-range non-nuclear ALCM of a new type has not been previously exhibited, no
less than 60 days in advance of the arrival, of the arrival of the first long-range non-nuclear ALCM of the
new type at the first air base for heavy bombers at which it is to be located. Such notification shall
include: the type of long-range non-nuclear ALCM; the planned date of the arrival of the first long-range
non-nuclear ALCM of the new type at the first air base for heavy bombers at which it is to be located; the
location for the exhibition of a long-range non-nuclear ALCM of the new type to demonstrate the
features that make such a long-range non-nuclear ALCM distinguishable from long-range nuclear
ALCMs; and the date for such an exhibition, which shall be no earlier than 15 days and no later than 30
days after such notification has been provided;
(14) notification, if a long-range non-nuclear ALCM of a new type has not been previously exhibited, no
less than 30 days in advance of the flight test, of the first flight test of a long-range non-nuclear ALCM
of the new type from an airplane of a type, from none of which a long-range nuclear ALCM has been
flight-tested. Such notification shall include: the type of long-range non-nuclear ALCM; if a heavy
bomber will be used to conduct the flight test, the type of heavy bomber; the planned date of the flight
test; the features that make a long-range non-nuclear ALCM of the new type distinguishable from
long-range nuclear ALCMs; the location for the exhibition of a long-range non-nuclear ALCM of the
new type to demonstrate such features; and the date for such an exhibition, which shall be no earlier than
15 days and no later than 30 days after such notification has been provided. No later than 48 hours after
such notification has been provided, one photograph of such a long-range non-nuclear ALCM shall be
provided through diplomatic channels. The long-range non-nuclear ALCM shown in such photograph
may be covered to the extent provided for in paragraph 5 of Section I of Annex 4 to the Inspection
Protocol;
(15) notification, if a long-range non-nuclear ALCM of a new type has not been previously exhibited, no
less than 30 days in advance of the flight test, of the first flight test of a long-range non-nuclear ALCM
of the new type armed with two or more weapons. Such notification shall include: the type of long-range
non-nuclear ALCM; if a heavy bomber will be used to conduct the flight test, the type of heavy bomber;
the planned date of the flight test; the features that make such a long-range non-nuclear ALCM of the
new type distinguishable from long-range nuclear ALCMs; the location for the exhibition of a long-range
non-nuclear ALCM of the new type to demonstrate such features; and the date for such an exhibition,
which shall be no earlier than 15 days and no later than 30 days after such notification has been provided.
No later than 48 hours after such notification has been provided, one photograph of such a long-range
non-nuclear ALCM shall be provided through diplomatic channels. The long-range non-nuclear ALCM
shown in such photograph may be covered to the extent provided for in paragraph 5 of Section I of
Annex 4 to the Inspection Protocol;
(16) notification of the development of a new kind of strategic offensive arm, no later than 30 days after
the first flight test of such an arm, unless issues concerning such an arm have been raised earlier within
the framework of the Joint Compliance and Inspection Commission. Such notification shall include: a
description of the new kind of strategic offensive arm; and the date of its first flight test.
VIII. Notifications Concerning Changes in the Content of Information Provided Pursuant to Article
VIII of the Treaty, Including the Rescheduling of Activities
Each Party shall provide to the other Party, pursuant to subparagraph 3(h) of Article VIII of the Treaty,
the following notifications concerning changes in the content of information provided pursuant to that
Article, including the rescheduling of activities:
(1) notification, no less than 12 hours in advance of the scheduled date of the initiation of the activity, of
a change to information specified in a notification provided in accordance with paragraph 4, 5, or 9 of
Section II of this Protocol. Such notification shall include: the number of the earlier notification; and the
changed information. If the change in the scheduled date specified in a notification provided in
accordance with paragraph 4, 5, or 9 of Section II of this Protocol is more than four days, an additional
notification shall be provided specifying the new scheduled date, subject to the same conditions as the
notification provided in accordance with paragraph 4, 5, or 9 of Section II of this Protocol;
(2) notification, no less than five days in advance of the scheduled date of the initiation of the activity,
of a change in the information specified in a notification provided in accordance with paragraph 1 of
Section IV of this Protocol. Such notification shall include: the number of the earlier notification; and the
new information. As an exception to the requirement to provide such notification five days in advance,
such notification shall be provided no later that 12 hours after the date specified in the notification provided
in accordance with paragraph 1 of Section IV of this Protocol if the following conditions are met: the
change in the scheduled date results from a delay in the initiation of the activity, and the inspected Party
determines, less than five days before the scheduled date or on that date, that a delay will occur.
Regardless of when the delay in the initiation of the activity occurred, if the change in the scheduled date
is more than five days, an additional notification shall be provided specifying the new scheduled date,
subject to the same conditions as the notification provided in accordance with paragraph 1 of Section IV of
this Protocol. (4 JCIC Agreement No. 20, Article 1.)
If there is a delay in an activity specified in an advance notification provided in accordance with a
paragraph of this Protocol other than paragraph 4, 5, or 9 of Section II, paragraph 1 of Section IV, or
paragraph 1 of Section VI and if that delay exceeds twice the amount of time in advance that is required
for such notification, an additional notification shall be provided, subject to the same conditions as the
original notification.
IX. Notifications Concerning Inspections and Continuous Monitoring Activities
Each Party shall provide to the other Party, pursuant to subparagraph 3(I) of Article VIII of the Treaty,
notifications concerning inspections and continuous monitoring activities provided for in Section III of
the Inspection Protocol.
X. Notifications Concerning Operational Dispersals
Each Party shall provide to the other Party, pursuant to subparagraph 3(j) of Article VIII of the Treaty,
the following notifications concerning operational dispersals:
(1) notification, no later than 18 hours after the dispersal begins, of the beginning of the operational
dispersal. Such notification shall include: the date and time of the beginning of the operational
dispersal; and the reasons for the operational dispersal;
(2) notification of the completion of the operational dispersal. Such notification shall include: the date
and time of the completion of the operational dispersal;
(3) notification of the suspension, pursuant to paragraph 2 of Article XIV of the Treaty, of the obligation
to provide notifications, to carry out cooperative measures, and to allow inspections during the
operational dispersal. Such notification shall include: the notifications, inspections, and cooperative
measures that are temporarily suspended; and the date on which such suspension began;
(4) notification, before the time specified in paragraph 2 of this Section, of the resumption of the
obligation to provide notifications, to carry out cooperative measures, and to allow inspections that had
been suspended in accordance with paragraph 3 of this Section. Such notification shall include: the
specific notifications, inspections, and cooperative measures that will resume; and the date of such
resumption;
(5) notification, by a Party that suspended notifications during the operational dispersal pursuant to
paragraph 2 of Article XIV of the Treaty, no later than three days after the date specified in the
notification provided in accordance with paragraph 2 or 4 of this Section, providing either:
(b) all the notifications that should have been provided but for the temporary suspension of the
obligation to provide such notifications;
(6) notification, by a Party that suspended notifications during the operational dispersal pursuant to
paragraph 2 of Article XIV of the Treaty and elected to provide updated data in accordance with
subparagraph 5(a) of this Section, no later than three days after the date specified in the notification
provided in accordance with paragraph 2 or 4 of this Section, providing all the notifications that would
have been provided in accordance with Sections III, VI, and VII of this Protocol but for the temporary
suspension of the obligation to provide such notifications;
(7) notification, no later than three days after the date and time specified in the notification provided in
accordance with paragraph 2 of this Section, of the location of all heavy bombers that were not located at
their air bases as of such date and time. Such notification shall also include, for each heavy bomber that
was not located at its air base: the specific air base to which the heavy bomber had not returned; and the
name of the airfield within national territory, or the general location outside national territory, where
such a heavy bomber was located.
This Protocol is an integral part of the Treaty and shall enter into force on the date of entry into force of
the Treaty and shall remain in force so long as the Treaty remains in force. As provided for in
subparagraph (b) of Article XV of the Treaty, the Parties may agree upon such additional measures as
may be necessary to improve the viability and effectiveness of the Treaty. The Parties agree that, if it
becomes necessary to make changes in this Protocol that do not affect substantive rights or obligations
under the Treaty, they shall use the Joint Compliance and Inspection Commission to reach agreement on
such changes, without resorting to the procedure for making amendments set forth in Article XVIII of
the Treaty.
Done at Moscow on July 31, 1991, in two copies, each in the English and Russian languages, both texts
being equally authentic.
FOR THE UNITED STATES OF AMERICA:
FOR THE UNION OF SOVIET SOCIALIST REPUBLICS:
RELEASABILITY OF INFORMATION
5 This Annex is included in this Protocol pursuant to Joint Compliance and Inspection Commission Agreement No. 17 of May 4, 1994.
I. Prohibitions
1. Each Party undertakes not to release to the public the original language texts of any notifications
provided pursuant to the Treaty that are transmitted by any other Party.
2. Each Party undertakes not to release to the public the information contained in the notifications
provided pursuant to the Treaty except as otherwise provided for in this Annex.
3. Each Party undertakes not to release to the public the information contained in the notifications
provided pursuant to the Treaty that are listed in Section III of this Annex for three months after the end of
the activities described in such notifications. Thereafter; except as provided for in paragraphs 5 and 6 of
this Section, each Party shall have the right to release the information contained in such notifications.
4. Each Party undertakes not to release to the public the information contained in the notifications
provided pursuant to the Treaty that are listed in Section IV of this Annex for three months after The end of
the activities described in such notifications. Thereafter; except as provided for in paragraphs 5 and 6 of
this Section, each Party shall have the right to release the information contained in such notifications
unless that Party is notified by the Party that provided the information in fulfilling its obligations provided for
in the Treaty that the information contained in such notifications shall not be released to the public for a
period of time as the Party that provided The information in fulfilling its obligations provided for in the
Treaty may prescribe or until further notice.
5. Each Party undertakes not to release to the public the name or passport number of any person
contained in any notification provided pursuant to the Treaty.
6. Each Party undertakes not to release to the public the geographic coordinates of any facility or other
location contained in any notification provided pursuant to the Treaty.
7. The provisions of this Annex shall not affect The rights and obligations of the Parties with respect to
the communication of certain information contained in notifications provided pursuant to the Treaty to
those individuals who, because of their official responsibilities, require such information to carry out
activities related to the fulfillment of the obligations provided for in the Treaty.
8. The Parties shall agree within the framework of the Joint Compliance and Inspection Commission on
the releasability of information contained in the notifications that may be additionally provided for by the
Parties to be used in implementing the Treaty, before such notifications are used.
II. Non-Releasable Information
Release of the information contained in the notifications listed below shall be governed by paragraph 2
of Section l of this Annex:
4. NOTIFICATION OF CHANGE IN DATA IN THE MEMORANDUM OF UNDERSTANDING, DUE TO
ACCIDENTAL LOSS OF A TREATY ACCOUNTABLE ITEM
5. NOTIFICATION OF CHANGE IN DATA IN THE MEMORANDUM OF UNDERSTANDING, DUE TO
DISABLEMENT BEYOND REPAIR OF A TREATY ACCOUNTABLE ITEM
20. NOTIFICATION OF DATA FROM UNIQUE IDENTIFIERS FOR ICBMS FOR MOBILE
LAUNCHERS OF ICBMS
36. NOTIFICATION OF VARIATION FROM CONFIGURATION OF TRAIN WITH RAIL-MOBILE TEST
LAUNCHERS WHILE TRAIN IS LOCATED OUTSIDE THE TEST RANGE
70. NOTIFICATION CONTAINING A REQUEST FOR DISPLAY IN THE OPEN OF ROAD-MOBILE
LAUNCHERS OF ICBMS
71. NOTIFICATION CONTAINING A RE QUEST FOR DISPLAY IN THE OPEN OF RAIL-MOBILE
LAUNCHERS OF ICBMS
72. NOTIFICATION CONTAINING A REQUEST FOR DISPLAY IN THE OPEN OF HEAVY BOMBERS
73. NOTIFICATION OF INABILITY TO DISPLAY HEAVY BOMBERS THAT ARE NOT READILY
MOVEABLE DUE TO MAINTENANCE OR OPERATIONS
74. NOTIFICATION OF CANCELLATION OF DISPLAY IN THE OPEN DUE TO FORCE MAJEURE
CIRCUMSTANCES
76. NOTIFICATION CONTAINING A REQUEST FOR DISPLAY IN THE OPEN OF SPECIAL PURPOSE
SUBMARINE
77. NOTIFICATION OF INABILITY TO DISPLAY SPECIAL PURPOSE SUBMARINE IN THE OPEN
BECAUSE THE SUBMARINE IS NOT IN PORT
78. NOTIFICATION OF FLIGHT TEST OF AN ICBM OR SLBM
81. NOTIFICATION OF INCOMPLETENESS OR INSUFFICIENT QUALITY OF TELEMETRIC
INFORMATION RECORDED ON TAPES
130. NOTIFICATION OF OBJECTION TO INSPECTORS, MONITORS OR AIR CREW MEMBERS WHO
ARE CURRENTLY ON LIST OF INSPECTORS, MONITORS, OR AIRCREW MEMBERS
135. NOTIFICATION OF JOINT COMPLIANCE AND INSPECTION COMMISSION - REQUEST FOR
MEETING
136. NOTIFICATION OF JOINT COMPLIANCE AND INSPECTION COMMISSION - REPLY TO REQUEST
FOR MEETING
137. NOTIFICATION OF JOINT COMPLIANCE AND INSPECTION COMMISSION - OTHER MESSAGES
138. NOTIFICATION OF JOINT COMPLIANCE AND INSPECTION COMMISSION - REQUEST TO
CONVENE A SPECIAL SESSION
139. NOTIFICATION OF JOINT COMPLIANCE AND INSPECTION COMMISSION - RESPONSE TO REQUEST TO CONVENE SPECIAL SESSION
140. NOTIFICATION OF JOINT COMPLIANCE AND INSPECTION COMMISSION - REQUEST FOR
ADDITIONAL INFORMATION RELATED TO SPECIAL SESSION
141. NOTIFICATION OF JOINT COMPLIANCE AND INSPECTION COMMISSION-RESPONSE TO
REQUEST FOR ADDITIONAL INFORMATION RELATED TO SPECIAL SESSION (6 JCIC Agreement No. 17, Article 3.)
151. NOTIFICATION OF THE DETERMINATION OF AGREED GEOGRAPHIC COORDINATES OF A
REFERENCE POINT AT A POINT OF ENTRY
152. NOTIFICATION OF THE INTENTION TO CHANGE A REFERENCE POINT FOR SATELLITE SYSTEM
RECEIVERS AT A POINT OF ENTRY (7 JCIC Agreement No. 19, Article 3, Paragraph 3.)
153. NOTIFICATION OF CHANGE TO THE BOUNDARY OF A FACILITY, SPECIFIED ON A SITE
DIAGRAM (8 JCIC Agreement No. 33, Article 1, Paragraph 1.)
III. Information Releasable After Three Months
Release of the information contained in the notifications listed below shall be governed by paragraph 3 of
Section I of this Annex:
1. NOTIFICATION OF DATA IN THE MEMORANDUM OF UNDERSTANDING, CURRENT AS OF ENTRY
INTO FORCE OF THE TREATY
2. NOTIFICATION OF UPDATED DATA IN THE MEMORANDUM OF UNDERSTANDING, AFTER THE
EXPIRATION OF EACH SIX-MONTH PERIOD
3. NOTIFICATION OF CHANGE IN DATA IN THE MEMORANDUM OF UNDERSTANDING, UNLESS
ANOTHER NOTIFICATION OF SUCH CHANGE HAS BEEN PROVIDED
6. NOTIFICATION OF CHANGE IN DATA IN THE MEMORANDUM OF UNDERSTANDING, RELATED TO
ELIMINATION OF SILO LAUNCHER OF ICBMS, SILO TRAINING LAUNCHER, SILO TEST
LAUNCHER, OR SOFT-SITE LAUNCHER, AT WHICH GRADING IS NOT TO BE PERFORMED (9 JCIC Agreement No. 17, Article 3.)
7. NOTIFICATION OF CHANGE IN DATA IN THE MEMORANDUM OF UNDERSTANDING, WITH
REGARD TO NEW FACILITIES, FACILITIES WHOSE CATEGORY HAS BEEN CHANGED, NEW
KINDS OF SUPPORT EQUIPMENT, AND NEW TYPES, CATEGORIES, VARIANTS, AND VERSIONS
OF TREATY ACCOUNTABLE ITEMS (10 JCIC Agreement No. 33, Article 1, Paragraph 2.)
8. NOTIFICATION OF CHANGE IN DATA IN THE MEMORANDUM OF UNDERSTANDING: EXHIBITIONS
OF NEW VARIANTS OF ICBMS AND SLBMS, AND NEW VERSIONS OF MOBILE LAUNCHERS OF
ICBMS
9. NOTIFICATION OF CHANGE IN THE DATA IN MEMORANDUM OF UNDERSTANDING, RELATED TO
ELIMINATION OF A DECLARED FACILITY
10. NOTIFICATION OF REDUCTION IN NUMBER OF WARHEADS ATTRIBUTED TO A DEPLOYED ICBM
OR SLBM
11. NOTIFICATION OF PLANNED AGGREGATE NUMBER AND CHANGES OF DEPLOYED STRATEGIC
OFFENSIVE ARMS
12. NOTIFICATION OF EXPECTED NUMBER OF DEPLOYED STRATEGIC OFFENSIVE ARMS IN
EXCESS OF PREVIOUSLY NOTIFIED PLANNED NUMBER
13. NOTIFICATION CONTAINING A REQUEST FOR CLARIFICATION OF LOCATIONS WITHIN ONE
MINUTE OF LATITUDE AND LONGITUDE OF EACH OTHER
14. NOTIFICATION CONTAINING A RESPONSE TO REQUEST FOR CLARIFICATION OF LOCATIONS
WITHIN ONE MINUTE OF LATITUDE AND LONGITUDE OF EACH OTHER
16. NOTIFICATION CONTAINING A DECLARATION OF THE EXISTENCE OF A NEW FACILITY OR
CHANGE IN CATEGORY OF A FACILITY
17. NOTIFICATION OF LOCATION OF A PRODUCTION FACILITY NOT PREVIOUSLY DECLARED AT
WHICH PRODUCTION OF ICBMS OR SLBMS OR FIRST STAGES OF ICBMS OR SLBMS IS
PLANNED
18. NOTIFICATION OF BEGINNING OF CONSTRUCTION OF A NEW SILO LAUNCHER OF ICBMS
19. NOTIFICATION OF CESSATION OF PRODUCTION OF ICBMS FOR MOBILE LAUNCHERS OF
ICBMS OR FIRST STAGES OF SUCH ICBMS AT A MONITORED FACILITY
21. NOTIFICATION THAT ICBMS OR SLBMS OF A TYPE ARE CONSIDERED ICBMS OR SLBMS OF A
RETIRED TYPE
22. NOTIFICATION OF TYPE, NUMBER AND LOCATION OF ICBMS OF A TYPE FOR MOBILE
LAUNCHERS OF ICBMS, WHICH ARE ICBMS OF A RETIRED TYPE
23. NOTIFICATION OF TYPE, NUMBER AND LOCATION OF ICBMS AND SLBMS OF RETIRED TYPES,
OTHER THAN ICBMS FOR MOBILE LAUNCHERS OF ICBMS
24. NOTIFICATION OF TYPE, NUMBER AND LOCATION OF ICBMS AND SLBMS OF FORMER TYPES
25. NOTIFICATION OF UPDATED DATA CONCERNING TYPE, NUMBER AND LOCATION OF ICBMS
AND SLBMS OF FORMER TYPES
26. NOTIFICATION OF COMPLETION OF TRANSIT OF NON-DEPLOYED ICBMS AND SLBMS
27. NOTIFICATION OF COMPLETION OF TRANSIT OF LAUNCH CANISTERS THAT REMAIN AFTER
FLIGHT TESTS OF ICBMS FOR MOBILE LAUNCHERS OF ICBMS
28. NOTIFICATION OF COMPLETION OF TRANSIT OF NON-DEPLOYED MOBILE LAUNCHERS OF
ICBMS
29. NOTIFICATION OF COMPLETION OF TRANSIT OF MOBILE TRAINING LAUNCHERS
30. NOTIFICATION OF VISIT OF HEAVY BOMBER OR FORMER HEAVY BOMBER TO A SPECIFIED
FACILITY OR ELIMINATED FACILITY WHEN VISIT EXCEEDS 24 HOURS
31. NOTIFICATION OF CONCLUSION OF VISIT OF HEAVY BOMBER OR FORMER HEAVY BOMBER TO
A SPECIFIED FACILITY OR ELIMINATED FACILITY WHEN VISIT EXCEEDS 24 HOURS
46. NOTIFICATION OF THROW-WEIGHT DATA FOR AN ICBM OF A NEW TYPE
47. NOTIFICATION OF THROW-WEIGHT DATA FOR AN SLBM OF A NEW TYPE
49. NOTIFICATION OF THROW-WEIGHT DATA FOR AN ICBM OF A NEW TYPE SUBJECT TO
LIMITATIONS PROVIDED FOR IN ARTICLE II OF THE TREATY
50. NOTIFICATION OF THROW-WEIGHT DATA FOR AN SLBM OF A NEW TYPE SUBJECT TO
LIMITATIONS PROVIDED FOR IN ARTICLE II OF THE TREATY
51. NOTIFICATION OF INCREASE IN ACCOUNTABLE THROW-WEIGHT OF AN ICBM
52. NOTIFICATION OF INCREASE IN ACCOUNTABLE THROW-WEIGHT OF AN SLBM
53. NOTIFICATION OF INTENTION TO PERFORM A CONVERSION
54. NOTIFICATION OF INTENTION TO PERFORM AN ELIMINATION
55. NOTIFICATION OF INTENTION TO PLACE AN ITEM ON STATIC DISPLAY
56. NOTIFICATION OF INITIATION OF A CONVERSION PROCESS NOT SUBJECTED TO INSPECTION
57. NOTIFICATION OF INITIATION OF AN ELIMINATION PROCESS NOT SUBJECTED TO INSPECTION
58. NOTIFICATION OF INTENTION TO INSTALL ICBM OF A DIFFERENT TYPE, OR TRAINING MODEL
OF A MISSILE OF A DIFFERENT TYPE IN A SILO LAUNCHER OF ICBMS
59. NOTIFICATION OF COMPLETION OF ELIMINATION OF A SILO LAUNCHER OF ICBMS, SILO
TRAINING LAUNCHER, SILO TEST LAUNCHER OR A SOFT-SITE LAUNCHER
60. NOTIFICATION OF COMPLETION OF ELIMINATION OF SLBM LAUNCHERS
61. NOTIFICATION OF COMPLETION OF ELIMINATION OF HEAVY BOMBERS OR FORMER HEAVY
BOMBERS
62. NOTIFICATION OF PLANNED DATE OF ARRIVAL OF CONVERTED HEAVY BOMBER AT THE
VIEWING SITE
63. NOTIFICATION OF COMPLETION OF CONVERSION OF A HEAVY BOMBER AND ITS ARRIVAL AT
THE VIEWING SITE
64. NOTIFICATION OF COMPLETION OF ELIMINATION OF ICBM OR SLBM OTHER THAN AN ICBM
FOR MOBILE LAUNCHERS OF ICBMS
65. NOTIFICATION OF COMPLETION OF PROCEDURES ASSOCIATED WITH PLACING AN ITEM ON
STATIC DISPLAY
66. NOTIFICATION OF STATIC TESTING OF ICBM FOR MOBILE LAUNCHERS OF ICBMS OR ITS
FIRST STAGE
67. NOTIFICATION OF REMOVAL OF PROPELLANT SEGMENTS FROM ICBM FOR MOBILE
LAUNCHERS OF ICBMS OR ITS FIRST STAGE
68. NOTIFICATION OF ANNUAL SCHEDULE FOR CONVERSION AND ELIMINATION
69. NOTIFICATION OF INITIATION OF ELIMINATION PROCESS FOR THE FIRST ICBM OF A
PARTICULAR TYPE OF ICBM FOR MOBILE LAUNCHERS OF ICBMS
75. NOTIFICATION OF EXIT OF BALLISTIC MISSILE SUBMARINE FROM COVERED FACILITY AFTER
COMPLETION OF SLBM LAUNCHER CONVERSION
79. NOTIFICATION OF PROPOSED DATE AND PLACE OF DEMONSTRATION OF TELEMETRY
TAPES OR APPROPRIATE EQUIPMENT TO PLAY BACK TELEMETRIC INFORMATION
RECORDED ON THOSE TAPES
80. NOTIFICATION CONTAINING REQUEST FOR OPPORTUNITY TO ACQUIRE PLAYBACK
EQUIPMENT
83. NOTIFICATION OF PLANNED DEPARTURE FROM A PRODUCTION FACILITY OF THE FIRST
PROTOTYPE ICBM OR SLBM
84. NOTIFICATION OF BASING MODE OF NEW TYPE OF ICBM
85. NOTIFICATION OF DECISION TO FORGO DEPLOYMENT OF AN ICBM OF A NEW TYPE AS AN
ICBM FOR MOBILE LAUNCHERS OF ICBMS
86. NOTIFICATION THAT PROTOTYPE ICBM OR SLBM SHALL BE CONSIDERED TO BE A NEW TYPE
87. NOTIFICATION OF CESSATION OF DEVELOPMENT OF AN ICBM OR SLBM OF A NEW TYPE AND
INTENTION NOT TO DEPLOY SUCH ICBMS OR SLBMS
88. NOTIFICATION OF DEPARTURE OF MOBILE LAUNCHER OF PROTOTYPE ICBMS FROM ITS
PRODUCTION FACILITY
89. NOTIFICATION OF EXIT OF FIRST HEAVY BOMBER OF A NEW TYPE FROM THE SHOP, PLANT
OR BUILDING WHERE ITS ASSEMBLY WAS PERFORMED
90. NOTIFICATION OF ARRIVAL OF THE FIRST HEAVY BOMBER OF A NEW TYPE, CATEGORY OR
VARIANT AT THE FIRST AIR BASE AT WHICH ANY SUCH HEAVY BOMBER HAS BEGUN TO BE
BASED
91. NOTIFICATION OF EXIT OF FIRST LONG-RANGE NUCLEAR ALCM OF A NEW TYPE FROM A
PRODUCTION FACILITY
92. NOTIFICATION OF PLANNED ARRIVAL OF FIRST LONG-RANGE NUCLEAR ALCM OF A NEW
TYPE AT THE FIRST AIR BASE FOR HEAVY BOMBERS AT WHICH IT WILL BE LOCATED
93. NOTIFICATION OF FIRST FLIGHT TEST OF A LONG-RANGE NUCLEAR ALCM FROM A BOMBER
OF A TYPE FROM NONE OF WHICH A LONG-RANGE NUCLEAR ALCM HAS PREVIOUSLY BEEN
FLIGHT-TESTED
94. NOTIFICATION OF ARRIVAL OF FIRST LONG-RANGE NUCLEAR ALCM OF A NEW TYPE AT
THE FIRST AIR BASE FOR HEAVY BOMBERS
95. NOTIFICATION OF EXIT OF FIRST LONG-RANGE NON-NUCLEAR ALCM OF A NEW TYPE
FROM THE PRODUCTION FACILITY
96. NOTIFICATION OF PLANNED ARRIVAL OF FIRST LONG-RANGE NON-NUCLEAR ALCM OF A
NEW TYPE AT THE FIRST AIR BASE FOR HEAVY BOMBERS AT WHICH IT WILL BE LOCATED
SIX MONTHS IN ADVANCE OF SUCH ARRIVAL
97. NOTIFICATION OF PLANNED ARRIVAL OF FIRST LONG-RANGE NON-NUCLEAR ALCM OF A
NEW TYPE AT THE FIRST AIR BASE FOR HEAVY BOMBERS AT WHICH IT WILL BE LOCATED
60 DAYS IN ADVANCE OF SUCH ARRIVAL
98. NOTIFICATION OF FIRST FLIGHT TEST OF A LONG-RANGE NON-NUCLEAR ALCM OF A NEW
TYPE FROM AN AIRPLANE OF A TYPE FROM NONE OF WHICH A LONG-RANGE NUCLEAR
ALCM HAS BEEN FLIGHT-TESTED
99. NOTIFICATION OF FIRST FLIGHT TEST OF A LONG-RANGE NON-NUCLEAR ALCM OF A NEW
TYPE ARMED WITH TWO OR MORE WEAPONS
104. NOTIFICATION OF CHANGE IN INFORMATION REGARDING THE INTENTION TO PERFORM A
CONVERSION
105. NOTIFICATION OF CHANGE IN INFORMATION REGARDING THE INTENTION TO PERFORM
AN ELIMINATION
106. NOTIFICATION OF CHANGE IN INFORMATION REGARDING THE INTENTION TO PLACE AN
ITEM ON STATIC DISPLAY
111. NOTIFICATION OF UPDATED DATA FOR EACH CATEGORY OF DATA CONTAINED IN THE
MEMORANDUM OF UNDERSTANDING, AFTER RESUMPTION OF OBLIGATION TO PROVIDE
NOTIFICATIONS THAT WERE SUSPENDED RELATED TO AN OPERATIONAL DISPERSAL
112. NOTIFICATION OF THE PROVISION OF ALL NOTIFICATIONS THAT WOULD HAVE BEEN
PROVIDED IN ACCORDANCE WITH SECTIONS Ill, VI, AND VII OF THE NOTIFICATIONS
PROTOCOL IF THERE HAD NOT BEEN A TEMPORARY SUSPENSION OF THE OBLIGATION
TO PROVIDE SUCH NOTIFICATIONS
114. NOTIFICATION CONTAINING THE INITIAL LISTS OF INSPECTORS, MONITORS, AND AIR
CREW MEMBERS
115. NOTIFICATION OF STANDING DIPLOMATIC CLEARANCE NUMBER FOR INSPECTION
AIRPLANES
116. NOTIFICATION OF INTENTION TO CONDUCT INSPECTION PURSUANT TO PARAGRAPH 2, 3,
4, 5, 6, 7, OR 10 OF ARTICLE Xl OF THE TREATY
117. NOTIFICATION OF INTENTION TO CONDUCT INSPECTION PURSUANT TO PARAGRAPH 8, 9,
11,12, OR 13 OF ARTICLE Xl OF THE TREATY
118. NOTIFICATION OF INTENTION TO REPLACE INSPECTORS CONDUCTING A CONVERSION
OR ELIMINATION INSPECTION
119. NOTIFICATION OF INTENTION TO ESTABLISH A PERIMETER AND PORTAL CONTINUOUS
MONITORING SYSTEM AT A FACILITY SUBJECT TO CONTINUOUS MONITORING AND OF
INTENTION TO CONDUCT AN ENGINEERING SITE SURVEY AT SUCH A FACILITY
120. NOTIFICATION OF COMMENCEMENT OF CONTINUOUS MONITORING DATA FACILITY AND
THE INITIAL ARRIVAL OF MONITORS AT THE FACILITY
121. NOTIFICATION CONTAINING A REQUEST FOR LOGISTIC SUPPORT FOR A FACILITY
SUBJECT TO CONTINUOUS MONITORING
122. NOTIFICATION OF INTENTION TO ENTER TERRITORY TO ESTABLISH PERIMETER AND
PORTAL CONTINUOUS MONITORING SYSTEM AT A FACILITY
123. NOTIFICATION OF INTENTION TO ENTER TERRITORY TO REPLACE MONITORS
124. NOTIFICATION OF INTENTION TO ENTER TERRITORY TO MAINTAIN PERIMETER AND
PORTAL CONTINUOUS MONITORING SYSTEM AT A FACILITY OR FACILITIES
125. NOTIFICATION OF INTENTION TO USE AN INSPECTION AIRPLANE FOR THE
TRANSPORTATION OF CARGO
126. NOTIFICATION OF CONFIRMATION OF INTENTION TO USE INSPECTION AIRPLANE FOR
TRANSPORTATION OF CARGO
127. NOTIFICATION CONTAINING RESPONSE TO REQUEST TO LAND INSPECTION AIRPLANE AT
AIRPORT ASSOCIATED WITH FACILITY SUBJECT TO CONTINUOUS MONITORING
128. NOTIFICATION OF AMENDMENTS TO LISTS OF INSPECTORS, MONITORS, AND AIRCREW
MEMBERS
131. NOTIFICATION CONTAINING THE AGREED LIST OF INSPECTORS, MONITORS, AND AIR
CREW MEMBERS
132. NOTIFICATION CONTAINING FLIGHT PLAN INFORMATION FOR INSPECTION AIRPLANE
133. NOTIFICATION OF FLIGHT PLAN APPROVAL FOR INSPECTION AIRPLANE
134. NOTIFICATION OF INTENTION TO CONDUCT A SPECIAL START FLIGHT
145. NOTIFICATION OF PLANNED EXIT FROM A MONITORED FACILITY OF THE FIRST ICBM,
SLBM, OR FIRST STAGE OF SUCH AN ICBM OR SLBM NOT SUBJECT TO NUMERICAL LIMITS
ON NON-DEPLOYED MISSILES
146. NOTIFICATION OF INTENTION TO CONDUCT CARGO EXAMINATION AT LOCATION OTHER
THAN A FACILITY SUBJECT TO CONTINUOUS MONITORING OR MONITORED FACILITY
147. NOTIFICATION OF CHANGE TO A FLIGHT ROUTE (11 JCIC Agreement No. 17, Article 3.)
148. NOTIFICATION CONTAINING A REQUEST REGARDING TRAINING, MAINTENANCE, SPARE
PARTS, AND REPLACEMENT PARTS FOR TELEMETRY EQUIPMENT
149. NOTIFICATION CONTAINING A RESPONSE TO A REQUEST REGARDING TRAINING,
MAINTENANCE, SPARE PARTS, AND REPLACEMENT PARTS FOR TELEMETRY EQUIPMENT
150. NOTIFICATION OF ACCEPTANCE OF OR CHANGE TO THE PROPOSED POINT OF ENTRY
AND PROPOSED DATE OF ARRIVAL OF THE TEAM OR OF THE DELIVERY OF SPARE PARTS
OR REPLACEMENT PARTS AT THE POINT OF ENTRY, OR CANCELLATION OF A REQUEST
REGARDING TELEMETRY EQUIPMENT (12 JCIC Agreement No. 18, Article 3, Paragraph 2.)
IV. Information Releasable After Three Months In Accordance with Paragraph 4 of Section l
of this Annex
Release of the information contained in the notifications listed below shall be governed by
paragraph 4 of Section I of this Annex:
15. NOTIFICATION OF TRANSFER OF ITEMS TO OR FROM A THIRD STATE
32. NOTIFICATION OF DEPARTURE OF EACH DEPLOYED RAIL-MOBILE LAUNCHER OF ICBMS
AND ITS ASSOCIATED MISSILE FROM A RAIL GARRISON FOR ROUTINE MOVEMENT
33. NOTIFICATION OF DEPARTURE OF EACH RAIL-MOBILE TEST LAUNCHER FROM A TEST
RANGE
34. NOTIFICATION OF RETURN OF EACH DEPLOYED RAIL-MOBILE LAUNCHER OF ICBMS AND
ITS ASSOCIATED MISSILE TO THE RAIL GARRISON FROM WHICH IT DEPARTED AFTER
ROUTINE MOVEMENT
35. NOTIFICATION OF RETURN OF EACH RAIL-MOBILE TEST LAUNCHER TO THE TEST RANGE
FROM WHICH IT DEPARTED
37. NOTIFICATION OF DEPARTURE OF EACH DEPLOYED MOBILE LAUNCHER OF ICBMS AND
ITS ASSOCIATED MISSILE FOR RELOCATION
38. NOTIFICATION OF COMPLETION OF RELOCATION OF A DEPLOYED MOBILE LAUNCHER OF
ICBMS AND ITS ASSOCIATED MISSILE
39. NOTIFICATION OF BEGINNING OF EXERCISE DISPERSAL OF DEPLOYED MOBILE
LAUNCHERS OF ICBMS AND THEIR ASSOCIATED MISSILES
40. NOTIFICATION OF COMPLETION OF EXERCISE DISPERSAL OF DEPLOYED MOBILE
LAUNCHERS OF ICBMS AND THEIR ASSOCIATED MISSILES
41. NOTIFICATION OF VARIATION FROM THE STANDARD CONFIGURATION OF A TRAIN UPON
DEPARTURE OF DEPLOYED RAIL-MOBILE LAUNCHERS OF ICBMS AND THEIR ASSOCIATED
MISSILES FROM A RAIL GARRISON FOR THE ASSOCIATED MAINTENANCE FACILITY OF
TRAINS WITH DEPLOYED RAIL-MOBILE LAUNCHERS OF ICBMS AND THEIR ASSOCIATED
MISSILES DURING ROUTINE MOVEMENTS OR RELOCATIONS
43. NOTIFICATION OF RETURN TO STANDARD CONFIGURATION OF A TRAIN WITH DEPLOYED
RAIL-MOBILE LAUNCHERS OF ICBMS AND THEIR ASSOCIATED MISSILES
44. NOTIFICATION OF BEGINNING OF MAJOR STRATEGIC EXERCISE INVOLVING HEAVY
BOMBERS
45. NOTIFICATION OF COMPLETION OF MAJOR STRATEGIC EXERCISE INVOLVING HEAVY
BOMBERS
48. NOTIFICATION OF ANNOUNCEMENT OF FLIGHT TEST TO DETERMINE BALLISTIC MISSILE
THROW-WEIGHT
82. NOTIFICATION OF FIRST FLIGHT TEST OF AN ICBM OR SLBM OF ONE EXISTING TYPE ON
WHICH ENCRYPTION OF TELEMETRIC INFORMATION WILL BE CARRIED OUT
100. NOTIFICATION OF DEVELOPMENT OF NEW KIND OF STRATEGIC OFFENSIVE ARM
101. NOTIFICATION OF CHANGE IN INFORMATION REGARDING THE DEPARTURE OF EACH
DEPLOYED RAIL-MOBILE LAUNCHER OF ICBMS AND ITS ASSOCIATED MISSILE FROM A
RAIL GARRISON FOR ROUTINE MOVEMENT
102. NOTIFICATION OF CHANGE IN INFORMATION REGARDING THE DEPARTURE OF EACH
RAIL-MOBILE TEST LAUNCHER FROM A TEST RANGE
103. NOTIFICATION OF CHANGE IN INFORMATION REGARDING THE DEPARTURE OF EACH
DEPLOYED MOBILE LAUNCHER OF ICBMS AND ITS ASSOCIATED MISSILE FOR
RELOCATION
107. NOTIFICATION OF BEGINNING OF OPERATIONAL DISPERSAL
108. NOTIFICATION OF COMPLETION OF OPERATIONAL DISPERSAL
109. NOTIFICATION OF SUSPENSION OF OBLIGATION TO PROVIDE NOTIFICATIONS, TO CARRY
OUT COOPERATIVE MEASURES, AND TO ALLOW INSPECTIONS DURING AN OPERATIONAL
DISPERSAL
110. NOTIFICATION OF RESUMPTION OF OBLIGATION TO PROVIDE NOTIFICATIONS, TO CARRY
OUT COOPERATIVE MEASURES, AND TO ALLOW INSPECTIONS WHICH HAD BEEN
SUSPENDED IN CONNECTION WITH AN OPERATIONAL DISPERSAL
113. NOTIFICATION OF LOCATIONS OF ALL HEAVY BOMBERS THAT WERE NOT LOCATED AT
THEIR AIR BASES AT THE COMPLETION OF THE OPERATIONAL DISPERSAL
129. NOTIFICATION OF AGREEMENT WITH OR OBJECTION TO PROPOSED INSPECTORS,
MONITORS, OR AIR CREW MEMBERS
142. NOTIFICATION CONTAINING A REQUEST FOR CLARIFICATION OF A NOTIFICATION
143. NOTIFICATION CONTAINING CLARIFICATION, CORRECTION, OR MODIFICATION OF A
NOTIFICATION
144. NOTIFICATION OF ADDITIONAL START MESSAGE (13 JCIC Agreement No. 17, Article 3.)
(a) for the loss as the result of an accident of an item accountable under the terms of the Treaty: the
approximate or assumed location of the accidental loss; the circumstances related to the loss, if such
circumstances are known; and the assumed date of the loss;
(a) for each deployed road-mobile launcher of ICBMs and its associated missile that has not returned to
the restricted area and to which transportation for inspectors is not provided, the specific facility or the
geographic coordinates of the location at which each such mobile launcher of ICBMs and its associated
missile is located; and the reason for its location there;
(a) the elimination of a silo launcher of ICBMs, silo training launcher, silo test launcher, or soft-site
launcher, if grading was performed during the process of its elimination. Such notification shall include:
location of the eliminated launcher; date of completion of elimination; and, in the case of a silo launcher
of ICBMs, silo training launcher, or silo test launcher, the type of ICBM it was associated with;
(a) for road-mobile launchers of ICBMs, the ICBM base and the restricted areas at that ICBM base at
which the display is requested;
(a) acceptance of the proposed point of entry and proposed date of arrival of the team or the delivery of
requested spare parts or replacement parts at the point of entry; or
(a) that Party's data updated for each category of data contained in the Memorandum of
Understanding; and the notifications of incomplete movements that would have been provided pursuant
to the provisions of this Protocol but for the temporary suspension of the obligation to provide such
notifications; or
George Bush
President of the United States of America
M. Gorbachev
President of the Union of Soviet Socialist Republics
CONTAINED IN NOTIFICATIONS